A two-level bypass road is being constructed on the 31–34 km section of the D012 Bektemir–Chirchik–Gazalkent–Chorbog highway.
A two-level bypass road is being constructed on the 31–34 km section of the D012 Bektemir–Chirchik–Gazalkent–Chorbog highway. Client: Committee for Roads Contractor: Tashkent Regional Branch of the Uzelkoprik Cluster. Manba: https://gov.uz/oz/uzavtoyul/news/view/96386